Check a Builder Quote intro
A builder’s quote can look straightforward at first glance.
There may be a total price, a list of works and perhaps a payment schedule.
But two quotations for the same project can look similar while actually covering very different scopes of work.
Before choosing a contractor, it is important to understand:
A lower quote is not necessarily better value if significant parts of the work have been left out.
At Tholos Architects, we help clients review builder quotations so they can compare contractors on a more consistent basis before making an appointment.
Check a Builder Quote explained
Builders do not always prepare quotations in the same way.
One contractor might provide:
Another may provide little more than:
Both documents may technically be quotations, but they do not provide the same level of information.
This is why simply comparing the final figure can be misleading.
Before comparing prices, check what information each builder received.
Ideally, all contractors should price from the same set of documents.
Depending on the project, these may include:
If one builder prices from a detailed technical package while another prices from early planning drawings, the quotations may not be directly comparable.
The quotation should reflect the project you intend to build.
Compare it against the drawings and look for important elements such as:
If something appears on the drawings but does not appear anywhere in the quote, ask whether it has been included.
Do not assume.
A strong quotation should explain what the contractor is actually providing.
Depending on the project, the scope may include:
The exact list varies by project.
What matters is that the scope is clear enough for you to understand what the price covers.
Exclusions are one of the most important parts of a builder’s quote.
Common exclusions can include:
There is nothing inherently wrong with exclusions.
The problem comes when the client assumes something is included and discovers later that it is not.
Ask for exclusions to be clearly identified.
Some items may not be described as exclusions simply because they have been overlooked.
That is why the quotation should be checked against the full project information.
Potentially missed items can include:
A missing item can later become an additional cost.
Check a Builder Quote
A provisional sum is an allowance for work that cannot yet be priced accurately.
This may happen because:
Examples might include:
A provisional sum is not necessarily a problem.
But you should understand that the final cost may be higher or lower than the allowance.
Some quotes include allowances for items that have not yet been selected.
These may include:
If the allowance is unrealistically low, the final project cost may rise once you make actual selections.
Check whether the allowance reflects the quality level you expect.
Always check the VAT position.
The quotation should make clear whether VAT is:
If VAT is applicable but has not been included in the headline figure, the real project cost can be significantly higher than it first appears.
Ask whether the quotation includes both labour and materials.
Also check whether any items are expected to be:
Clear responsibility for procurement can prevent confusion later.
Kitchen-related costs can vary considerably.
Clarify:
A quote stating “kitchen installation” may not necessarily include everything you assume.
Bathroom work can be handled in different ways.
Ask whether the quotation includes:
Again, separate supply and installation responsibilities should be clear.
Check a Builder Quote
Electrical work is often described too generally.
Look for detail around:
If the project requires many fittings, vague electrical allowances can create additional cost later.
The quotation should make clear whether it includes:
If existing systems need alteration, that should also be addressed.
Structural work can represent a significant part of the cost.
Ask whether the quotation includes:
A line reading simply “steelwork” may need clarification.
Groundworks can contain uncertainty, particularly before excavation begins.
The quote may need to cover:
Ask whether the price assumes specific ground conditions or depths.
Scaffolding can be a substantial cost.
Clarify:
This is especially relevant for:
Do not assume waste disposal is included.
Ask whether the quote covers:
Also check whether any hazardous or specialist waste is treated separately.
Some contractors include decoration.
Others stop after plastering or basic making good.
Clarify whether the quotation covers:
Flooring may be:
Make sure you know whether the price covers:
External works can easily be forgotten.
These may include:
If external areas will be affected by construction, check how they will be left at completion.
Construction often requires temporary measures.
These might include:
These costs should be understood rather than appearing unexpectedly later.
check a builder quote
Clarify which costs and responsibilities sit with the builder.
Depending on the project, this may involve:
Professional and statutory fees may be excluded from the building quote even where the contractor coordinates the related work.
A quote may include a proposed payment structure.
Make sure you understand:
Payments should make sense in relation to the work being carried out.
A quote that requires a large proportion of the contract price before equivalent progress has been made deserves careful review.
If the builder asks for a deposit, ask why.
It may relate to:
The reason should be transparent.
The quote may state a duration or expected start date.
Ask:
A very short proposed programme can be just as questionable as an excessively long one if it does not match the amount of work involved.
Ask whether the price is:
The terminology matters.
A quotation can still contain variable elements even where there is a headline total.
check a builder quotation
Changes happen on construction projects.
Ask how the builder deals with variations.
A good process should make clear:
Where practical, variations should be agreed before the work proceeds.
Builder quotations sometimes contain internal inconsistencies.
For example:
Possible improvements include:
Or:
These issues should be clarified in writing before the quotation is accepted.
If you have several quotations, create a comparison based on individual elements rather than only the final total.
Compare:
This often explains why one contractor appears substantially cheaper than another.
A low quotation may genuinely represent good value.
But it can also be lower because it includes less.
For example, one builder may exclude:
while another includes all of them.
Once those costs are added later, the supposedly cheaper quote may not remain cheaper.
Price alone works in both directions.
The highest quotation is not automatically the most complete or highest-quality option.
You still need to assess:
A higher number does not remove the need for due diligence.
check a builder quote
If something is vague, ask.
Useful clarification questions might include:
A professional builder should be able to explain their quotation.
Important changes or explanations should ideally be recorded in writing.
If a builder verbally confirms that something is included, ask for the quotation or associated documentation to be updated.
This reduces the risk of different recollections later.
You do not need to understand every technical construction detail.
But before accepting a quote, you should understand:
If the quotation cannot be explained clearly, that is a problem in itself.
Where Tholos is involved in your project, we can help assess whether quotations reflect the proposed work.
Depending on the project and service, this may include:
The aim is not simply to identify the cheapest contractor.
It is to help you understand what each contractor is actually offering.
Before accepting a quotation, check:
Anything unclear should be resolved before appointment.
Client experience
Lorem ipsum dolor sit amet, consectetur adipiscing elit. We had a vision for our home but no idea how to realise it. Tholos Interiors took complete ownership of the project — every detail was considered, every decision explained. The result exceeded everything we had imagined.
– Lawrence Ipsum, Homeowner · London –
Frequently Asked Questions
What should a builder quote include?
A builder’s quote should clearly describe the proposed work, total price, relevant allowances, exclusions, VAT position and any important assumptions.
For larger projects, more detail is generally preferable.
How do I compare two builder quotes?
Check whether both builders have priced the same drawings and scope.
Then compare inclusions, exclusions, provisional sums, allowances, programme and payment terms rather than only the final totals.
Why are builder quotes so different?
Differences may arise from:
A large difference should be investigated before making a decision.
What is a provisional sum in a builder quote?
A provisional sum is an allowance for work that cannot yet be priced accurately.
The final amount may change when the work or specification becomes clearer.
Can an architect check a builder’s quote?
Yes. Depending on the service provided, an architect can help review the quotation against the project information, identify omissions and compare different contractor proposals.
Understand the Quote Before You Choose the Builder
A builder’s quote should help you understand the cost of delivering your project.
It should not leave you guessing what has or has not been included.
Taking the time to review:
before appointing a contractor can prevent much bigger problems during construction.
At Tholos Architects, we can help clients assess builder quotations and approach contractor selection with clearer information.
Disclaimer
This article is part of a series created by our dynamic marketing team for informational purposes only. While we strive to review all content thoroughly, occasional oversights may occur, even after publication. Therefore, we cannot accept liability for any interpretations or use of the information provided. For the most up-to-date information or to report any discrepancies, please contact us at hello@tholos-architects.com.
Start your project