architects FROM LONDON ↓
RIBA Chartered
Award winning
London · Vienna · Rome
Featured in The Times
Panel at Grand Designs Live
Builder Dispute Support intro
Building disputes can develop for many reasons.
A disagreement may begin with something relatively small, such as a variation, delayed payment or unclear item in a quotation, and then become more difficult as the project progresses.
Common problems include:
When a construction dispute develops, the first priority is usually to establish what has actually been agreed, what work has been completed and where the disagreement has come from.
At Tholos Architects, we can help clients review the architectural and construction information surrounding a dispute and bring greater clarity to the technical issues involved.
We are not a substitute for a solicitor where legal advice is required, but architectural and technical input can be extremely useful when the dispute relates to drawings, scope, workmanship, variations or the condition of the work.
Construction projects involve many separate decisions.
These can include:
If those decisions are not clearly documented, different people can end up believing that different things were agreed.
Disputes often arise from a combination of:
The earlier the underlying issue is identified, the easier it may be to resolve.
Builder Dispute Support explained
Builder dispute support can involve reviewing the project information to understand the technical and contractual background to the disagreement.
Depending on the situation, this may include reviewing:
The purpose is to establish a clearer picture of what was designed, what was priced and what appears to have been constructed.
One common source of disagreement is work that does not appear to match the approved or construction drawings.
Examples may include:
The first step is to establish which drawings were actually issued for construction.
Drawings can go through multiple revisions, so it is important to compare the completed work against the correct version.
Clients and builders can disagree about whether work has been completed to an acceptable standard.
Concerns may relate to:
Not every cosmetic imperfection represents defective construction.
Equally, some issues may have technical consequences beyond appearance.
A site review can help identify what the issue actually is before decisions are made about remedial work.
Scope disputes are extremely common.
A homeowner may believe something was included while the builder believes it was excluded.
This can happen with items such as:
The relevant documents need to be reviewed together.
These may include:
One document alone may not tell the whole story.
A quotation can become a source of disagreement where it is:
A dispute may arise because the builder believes additional work falls outside the quotation while the client believes it was already included.
The building contract may help establish:
Problems can arise where:
Architectural review can help identify inconsistencies between the project documents.
Legal interpretation of the contract should be handled by an appropriately qualified legal professional.
Changes during construction are normal.
Problems arise when there is disagreement over:
Ideally, variations should record:
Where this has not happened, the project records may need to be reviewed retrospectively.
Additional costs can arise from legitimate unforeseen conditions.
Examples include:
The key questions are usually:
Good records can be crucial.
Construction delays can arise for many reasons.
These may include:
The first task is often to establish what actually caused the delay.
Reviewing:
can help build a clearer timeline.
One of the most stressful situations is when progress slows dramatically or the contractor stops attending site.
Before taking major action, establish:
If the relationship is close to breaking down completely, legal advice may be appropriate before terminating a contract or appointing someone else.
If a contractor has left the project, the immediate priority is often to understand the physical condition of the works.
This may involve checking:
The unfinished work may need to be documented before another contractor changes it.
Photographs, drawings and a written record can be extremely useful.
Incomplete work should be documented clearly.
This may include:
A structured list can help distinguish between:
This information can then be used when discussing completion with the existing builder or obtaining prices from another contractor.
Where work may be defective, avoid jumping immediately to a solution.
First establish:
In some cases, specialist input may be required from:
Tholos can help identify when additional expertise is appropriate.
Not every outstanding item is a major defect.
A snagging list commonly deals with minor matters such as:
More significant defects may involve:
Separating minor snagging from more serious concerns can make discussions with the builder much clearer.
Payment disputes may arise where:
Before withholding or making significant payments, the relevant contract terms should be understood.
Where necessary, obtain legal advice.
Architectural input can help establish what work appears to have been completed relative to the design and scope.
Clients and builders may disagree about how much of the project has been completed.
A progress review can consider:
However, percentage completion is not always the same as percentage of contract value.
Different stages of construction can have very different costs.
Sometimes a dispute relates to materials rather than workmanship.
Examples include:
The project documents should be checked to establish whether the material was:
A builder may sometimes make a change because they believe it is:
That does not automatically mean the change is acceptable.
Where the design has been altered without agreement, establish:
Builder Dispute Support
Changes made during construction can sometimes affect planning compliance.
Examples might include:
If the completed work differs materially from the approved planning drawings, the position should be reviewed.
Depending on the circumstances, further planning action may be required.
A dispute may also involve work that does not appear to comply with the technical design or Building Regulations requirements.
Possible areas include:
Building Control involvement and inspection records can be important evidence.
Problems can arise where required inspections were not arranged during construction.
This may make it more difficult to confirm work that is now concealed.
Depending on the situation, Building Control may request:
The appropriate response depends on what work has been completed.
At the end of a project, missing documentation can become another source of dispute.
This may include:
A list of outstanding documents can help clarify what still needs to be provided.
If a dispute is escalating, document the site carefully.
This can include:
Avoid relying entirely on memory.
A clear record can be useful whether the issue is eventually resolved informally or requires professional advice.
Important communication should be recorded.
Keep:
If important discussions occur verbally, consider confirming the key points afterwards in writing.
If another contractor immediately removes or alters disputed work, it may become much harder to establish what originally existed.
Where practical, document concerns before remedial work begins.
For significant disputes, professional or legal advice may be appropriate before evidence is altered.
Construction disputes can become emotionally charged very quickly.
But the most useful question is often:
What specifically is disputed?
For example:
Breaking the dispute into individual issues can make it easier to resolve.
A dispute may contain several different types of problem.
For example:
Technical issue:
Is the roof detail correct?
Commercial issue:
Who pays to change it?
Legal issue:
Who is contractually responsible?
These are related but not identical questions.
Tholos can assist with architectural and technical issues.
Contractual and legal disputes may require specialist legal advice.
Often, yes.
Many disputes are resolved through:
More formal procedures may be required where agreement cannot be reached.
The appropriate route depends on the contract and dispute.
Mediation can allow both parties to discuss the dispute with an independent mediator.
The mediator does not normally impose a decision.
Instead, the aim is to help the parties reach their own agreement.
It can sometimes be a more proportionate approach than litigation.
Adjudication is a formal dispute-resolution process commonly used within construction.
Whether it is available and appropriate depends on the contractual and legal circumstances.
If adjudication is being considered, specialist legal advice should be sought.
Court proceedings may become necessary in some disputes.
However, litigation can involve:
Before pursuing legal action, clients should obtain advice about their particular circumstances.
Tholos does not provide legal representation.
More serious disputes may require independent expert evidence.
An expert may be asked to consider matters such as:
The role of a formal expert witness is different from ordinary architectural project support and may require a specifically appointed independent professional.
Builder dispute
That depends on the circumstances.
If Tholos designed or administered the original project, there may be limitations on acting as an independent expert in a formal dispute.
Where formal independent expert evidence is required, a separate suitably qualified professional may be more appropriate.
However, Tholos can still help explain the architectural information and project history where appropriate.
Tholos may also be able to review projects originally designed by another practice.
This can include reviewing:
The level of involvement will depend on the information available and the nature of the dispute.
Replacing a contractor during construction can be complex.
Before another builder takes over, it is useful to establish:
Contractual and legal issues should also be considered before terminating an existing appointment.
A replacement contractor will usually need enough information to understand:
Incomplete or defective work can make pricing more difficult than starting a project from the beginning.
A clear schedule of remaining works can help.
Where defects need correction, the solution should be properly considered.
Remedial work may require:
Simply covering over a problem is not the same as resolving it.
Depending on the project and the nature of the problem, Tholos may be able to help with:
Our role is focused on the architectural and technical side of the project.
Where the dispute involves legal interpretation, formal claims or contract termination, appropriate legal advice should also be obtained.
If a dispute has developed, gather:
Then identify:
A clear record makes the situation much easier to assess.
Client experience
Lorem ipsum dolor sit amet, consectetur adipiscing elit. We had a vision for our home but no idea how to realise it. Tholos Interiors took complete ownership of the project — every detail was considered, every decision explained. The result exceeded everything we had imagined.
– Lawrence Ipsum, Homeowner · London –
Frequently Asked Questions
What should I do if I have a dispute with my builder?
Start by gathering the contract, quotation, drawings, correspondence, payment records and photographs.
Identify the specific points in dispute rather than treating the entire project as one problem.
Professional or legal advice may then be appropriate depending on the issue.
Can an architect help with a builder dispute?
Yes, particularly where the dispute involves drawings, scope, workmanship, construction details, variations or incomplete work.
Legal interpretation should be handled by a legal professional.
What if the builder has not followed the drawings?
The work should first be compared against the correct construction drawings and revisions.
The significance of any difference then needs to be assessed.
What if I believe the work is defective?
Document the issue before it is altered.
Depending on the nature of the defect, an architect, structural engineer, surveyor or other specialist may need to inspect it.
Can I dismiss my builder and hire someone else?
Ending a construction contract can have legal and financial consequences.
Review the contract and obtain appropriate advice before terminating an appointment.
Get Clarity Before the Dispute Gets Worse
A construction dispute can quickly become more difficult when technical, financial and contractual issues become mixed together.
The first step is usually to create clarity.
Establish:
From there, it becomes much easier to decide what action is appropriate.
At Tholos Architects, we can help review the architectural and technical side of a builder dispute and identify the information needed to move the project forward.
Disclaimer
This article is part of a series created by our dynamic marketing team for informational purposes only. While we strive to review all content thoroughly, occasional oversights may occur, even after publication. Therefore, we cannot accept liability for any interpretations or use of the information provided. For the most up-to-date information or to report any discrepancies, please contact us at hello@tholos-architects.com.
Start your project